Webster Elementary School

2014 | Minneapolis, Minnesota United States
Collections used

K-12

The school district hired TSP, Inc. to re-invigorate Webster Elementary. The newly renovated school was to be designed to meet the district’s new prototype standards.

Project Facts:

Country: USA
City: Minneapolis, MN
Type of Project: Renovation 
Installation Period: 2014-2015
Designer/Architect: TSP, Inc.
Total flooring surface installed: 350 lineal feet of stair treads; 36,390 sq. ft. rubber flooring
Products Installed: Mesto Configurations, MicroTone™ Rubber Tile, Rubber Stair Treads